This unique engineering challenge could only be achieved through the use of SIPs. The addition has 20-foot ceilings and wide open spaces.
Special LVL spline bents combined with SIPs provided the structural strength to achieve the owner's dream and the architect's vision.
NorthEast SIPs worked closely with the builders to pre-fabricate and pre-assemble the walls and splines before erection began.
Gallery

















